Calder & Mason
Disciplined Craft for British Homes
Get a quote
Bathroom and Wet Room Refurbishment

Bathroom and Wet Room Refurbishment

Designed for properties requiring complete renewal of wash facilities, from cloakrooms to primary suites. We strip back outdated substrates, apply membrane waterproofing, and install concealed cisterns, brassware, and tiles. The outcome is an impermeable, clean-lined room constructed to withstand daily moisture.

All services
£2800per bathroom

What is included

  • ✓Complete strip-out and structural subfloor reinforcement
  • ✓Continuous tanking membrane application
  • ✓Concealed valve and frame installations
  • ✓Large-format porcelain and natural stone tiling
  • ✓Shower tray recessed or level-access formation
  • ✓Sanitaryware connection and silicone detailing

Request an Initial Consultation

Submit your address and scope overview; we review feasibility and call to set up a site visit.

Call back within one business day. Free consultation. No spam, no obligations.

Questions about this service

Can you install level-access walk-in showers on timber floorboards?

Yes, we install dedicated structural shower formers recessed directly between floor joists to create the correct fall without steps.

Do you handle ventilation requirements?

Every bathroom refurbishment includes calculating airflow requirements and installing inline or wall-mounted extractor fans to building standards.

Who disposes of the old sanitaryware and tiles?

We remove all strip-out rubble and decommissioned fixtures from site under our registered waste carrier documentation.

Why Property Owners Choose Us

Certified Waterproofing

All shower recesses and bath surrounds receive full tanking prior to tiling, preventing slow structural rot.

Symmetrical Tile Layouts

We lay out tile lines relative to primary fittings to avoid sliver cuts in prominent sightlines.

Accessible Service Panels

Concealed valves and pipework junctions are fitted with discrete access hatches for future maintenance.

How We Deliver a Project

  1. 1

    Strip-Out and Drainage Rework

    Existing tiles and sanitaryware are removed and falls on waste runs are adjusted to ensure rapid drainage.

  2. 2

    Tanking and Boarding

    Moisture-resistant boards and liquid or sheet tanking systems are applied to all wet envelopes.

  3. 3

    Tiling and Grouting

    Tiles are mapped from a central datum, laid with level joints, and pointed with water-repellent grout.

  4. 4

    Sanitaryware Commissioning

    Taps, mixers, screens, and basins are secured, tested under system pressure, and neatly sealed.

All services

Discuss Your Property Works

Send us your architectural notes, dimensions, or a summary of repairs needed. We review the scope and schedule an initial telephone consultation within one working day.